Successful installation, wiring, and commissioning of high-capacity 3-phase UPS power backup systems for the Silicon Carbide (SiC) manufacturing line.
Successful execution and installation of MEP hookup systems (Phase 2) for advanced manufacturing lines at Coherent Advanced Optics Plant.
Hoàn thành công trình công viên xanh cho tập đoàn Coherent nhà máy Advanced Optics
“Remove old cooling, electric system… Install new cooling, new ducting,… Install electric system”
“- Mechacnical installation: Pump, Pipe, filter… – PLC modification Electrical installation: wiring, cabinet, sensors…”
– Remove old exhaust system – install new exhaust system – Remove and install electric system for sensors
“- Remove the old ducting and install the new ducting for T81,T82 – Flexi glass installation at T82 – Install electric system for new sensors”